European funded projects

I. EU – FUNDED PROJECTS- SUBMITTED TO  EVALUATION
1. STRENGHTENING THE CAPACITY OF PUBLIC NON-UNIVERSITY SCHOOLS IN THE MUNICIPALITY OF CONSTANȚA IN THE CONTEXT OF COVID-19
Financing source Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
Beneficiary Administrative Territorial Unit Constanța Municipality
General objective The general objective of the project aims to ensure an adequate capacity to manage the health crisis at the level of 92 non-university schools in Constanța, by equipping them with medical protection equipment and medical devices necessary to reduce the risk of spreading SARS-CoV-2 infection.

Date for submitting the financing application 16.12.2020

Suggested implementation period 7 months
II. EU – FUNDED PROJECTS – STAGE PRECONTRACTING/CONTRACT
III EU-FUNDED PROJECTS – IN IMPLEMENTATION
1. ENDOWMENT OF SCHOOLS IN THE MUNICIPALITY OF CONSTANTA WITH IT EQUIPMENTS, IN THE CONTEXT OF COVID-19 
Financing source Competitiveness Operational Programme 2014-2020, Axis 2: Information and Communication Technology (ICT) for a competitive digital economy, Specific objective 2.4 Increase the use of Internet
Beneficiary Administrative Territorial Unit Constanţa Municipality
General objective The general objective of the project is to facilitate access to on-line education in the context of the SARS-CoV-2 pandemic, by endowment of secondary schools in Constanța with IT mobile equipment such as school tablets, as well as other equipment / electronic devices necessary for on-line teaching activity in right conditions, in the school year 2020/2021.

Date for submitting the financing application

16.11.2020

Suggested implementation period 12 months
2. REHABILITATION OF PRIMARY THERMAL NETWORKS / THERMAL ENERGY TRANSPORT IN THE MUNICIPALITY OF CONSTANȚA – STAGE 2
Financing source Large Infrastructure Operational Programme 2014-2020, Axis 7, Specific objective 7.1 Increase of the energy efficiency  in centralized heat transmission and distribution systems in selected cities
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract  889 / 31.01.2022
Total value of the project 116.136.102,77 lei, out of which eligible value 97.804.515,67 lei
General objective The general objective of this project is to increase the energy efficiency of the heating system in the Municipality of Constanța, by reducing thermal energy losses in the primary heating networks.
Suggested implementation period 31.01.2022 – 31.12.2023
3. REHABILITATION OF PRIMARY THERMAL NETWORKS / THERMAL ENERGY TRANSPORT IN THE MUNICIPALITY OF CONSTANȚA – STAGE 1
Financing source Large Infrastructure Operational Programme 2014-2020, Axis 7, Specific objective 7.1 Increase of the energy efficiency  in centralized heat transmission and distribution systems in selected cities
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 822 / 13.01.2022
Total value of the project 115.405.074,99 lei, out of which eligible value 97.189.192,26 lei
General objective The general objective of this project is to increase the energy efficiency of the heating system in the Municipality of Constanța, by reducing thermal energy losses in the primary heating networks
Suggested implementation period 13.01.2022 – 31.12.2023
4. BUILDING OF A MODULAR HOSPITAL, FOR STRENGTHENING MEDICAL CAPACITY OF THE CLINICAL HOSPITAL FOR INFECTIOUS DISEASES CONSTANȚA, IN THE CONTEXT OF COVID-19
Financing source Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 706/16.11.2021

Total value of the project 14.578.935,74 lei, out of which eligible value 14.570.576,74 lei

General objective

The general objective of this project is to strengthen and increase the capacity to manage the emergency situation caused by the COVID-19 health crisis at the Clinical Hospital of Infectious Diseases Constanța, by creating a modular hospital to supplement the capacity for day hospitalization (emergency reception space ans isolation of patients suspected / confirmed with virus).
Suggested implementation period

23.02.2021 – 30.06.2023

5. INCREASE OF THE ENERGY EFFICIENCY OF MIRCEA CEL BĂTRÂN NATIONAL COLLEGE BUILDING, CONSTANȚA
Financing source Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM
Beneficiary Administrative Territorial Unit Constanta Municipality
Financing contract 7290/25.11.2021
General objective The general objective of this project is the increase of the energy efficiency of Mircea cel Bătrân National College building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.

Total value of the project 19.398.470,14 lei, out of which eligible value 13.880.117,17 lei
Value of eligible co-financing (2%) 277.602,35 lei

Suggested implementation period 25.11.2021 – 31.12.2023

6. RECHARGING STATIONS FOR ELECTRIC VEHICLES IN CONSTANTA MUNICIPALITY
Financing source Environmental fund administration – „The programme regarding reducing green house gas emision in transports through promoting the infrastructure for non poluting vehicles in terms of energy: electric vehicle charging in all county capital „
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract  2/GES/02.11.2021
Total value of the project  4.414.727,55 lei, out of which eligible value 3.839.573,41 lei
General objective To reduce the green house gas emision generated by vehicle traffic by developing the infrastructure for electric charging by mouting 18 vehicle electric charging stations.

Suggested implementation period 02.11.2021 – 01.11.2022
7. INCREASE OF THE ENERGY EFFICIENCY OF DECEBAL THEORETICAL HIGH SCHOOL BUILDING, CONSTANȚA
Financing source Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM
Beneficiary Administrative Territorial Unit Constanta Municipality
Financing contract 6816/02.04.2021
General objective The general objective of this project is the increase of the energy efficiency of Decebal Theoretical High School building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements

Total value of the project 13.644.198,43 lei, out of which eligible value 11.100.255,91 lei
Value of eligible co-financing ( 2% ) 222.005,12 lei

Suggested implementation period 02.04.2021 – 30.09.2023

8. REHABILITATION, MODERNISATION AND ENDOWMENT OF “MUGUREL” FULL-DAY KINDERGARTEN, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 4/ Investment priority 4.4
Beneficiary Administrative Territorial Unit Constanta Municipality
Financing contract 6737/05.03.2021
General objective By rehabilitating, modernising and equipping “MUGUREL” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union.
Total value of the project 3.987.982,84 lei out which eligible value 3.913.739,39 lei
Value of eligible co-financing (2%) 78.274,79 lei
Suggested implementation period 05.03.2021 – 31.07.2023
9. INCREASE OF THE ENERGY EFFICIENCY OF TRAIAN THEORETICAL HIGH SCHOOL BUILDING, CONSTANȚA
Financing source Regional Operational Programme 2014-2020, Axis 3, Investments priority 3.1.B-Public buildings/Call 2/NE, SE, SM
Beneficiary Administrative Territorial Unit Constanta Municipality
Financing contract  6701/26.02.2021
General objective The general objective of this project is the increase of the energy efficiency of Traian Theoretical High School building, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.

Total value of the project  13.378.737,47 lei out of which eligible value 10.811.964,95 lei
 Value of eligible co-financing (2%) 216.239,30 lei
Suggested implementation period 26.02.2021-30.06.2023

10. INTEGRATED RECONDITIONING OF THE PEDESTRIAN AREA IN THE HISTORIC CENTRE OF CONSTANȚA MUNICIPALITY – STAGE II
Financing source Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 6690/22.02.2021
General objective The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the historic area of Constanța Municipality through a series of measures which lead to the increase of pedestrian mobility. Moreover, the intention is to make the use of motor vehicles in the historic centre of the municipality less attractive. Therefore, by rehabilitating some streets and by restricting the access for personal motor vehicles in this area of Constanța Municipality, the aim is to improve the sustainable urbane mobility, as well as to reduce the CO2 equivalent emissions.
Total value of the project  26.443.554,43 lei out of which eligible value 25.317.651,31 lei
Value of eligible co-financing (2%)  506.353,03 lei
Suggested implementation period  22.02.2021 – 30.11.2023
11. DEVELOPING CULTURAL AND CREATIVE INDUSTRIES IN THE BLACK SEA BASIN (ACRONYM CREA – CENTERS )
Financing source Joint Operational Programme „Black Sea Basin” 2014-2020
Leader Cekmekoy Municipality – Turkey ;
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Greece, Bulgaria and Ukraine;
Total value of the project 1.448.754,24 euro

Value of partner
Administrative Territorial Unit Constanța Municipality
– total eligible value:  213.750 euro;
– non-refundable eligible amount from ENI: 196.650 euro (92%);
– eligible co-financing: 17.100 euro (8%).

Implementation period 25.12.2020 – 24.12.2022
General objective Setting up and developing structures and networks for designers, entrepreneurs, academicians and artists operating in the field of cultural and creative industries (CCIs) in the Black Sea Basin.
Results 5 co-working spaces established and endowed in partner locations (1 space/partner), 86 mass-events organized for collaboration of people from CCIs.
12. STRENGHTENING MEDICAL CAPACITY OF THE CLINICAL HOSPITAL FOR INFECTIOUS DISEASES CONSTANȚA, IN THE CONTEXT OF COVID-19
Financing source Large Infrastructure Operational Programme 2014-2020, Axis 9, Specific objective 9.1 Increase the capacity to manage the COVID-19 health crisis
Leader Administrative Territorial Unit Constanța Municipality
Partner Clinical Hospital for Infectious Diseases Constanța
Financing contract 380 / 02.10.2020
General objective The general objective of this project is to strengthen and increase the capacity to manage the emergency situation caused by the COVID-19 health crisis at the Clinical Hospital of Infectious Diseases Constanța, by providing medical and personal protection equipment necessary to ensure appropriate treatment for all patients infected with SARS-CoV-2 and to reduce the risk of contamination of hospital staff and patients.

Total value of the project 22.681.089,84 lei, from which eligible value 22.672.404,84 lei (100% FEDR financing)
Suggested implementation period 02.10.2020 – 30.06.2022

13. REHABILITATION, MODERNISATION AND ENDOWMENT OF TECHNOLOGICAL HIGH SCHOOL FOR ELECTRICAL ENGINEERING AND TELECOMMUNICATION, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 4/ Investment priority 4.4, specific objective 4.5
Financing contract 5797/28.07.2020
Beneficiary Administrative Territorial Unit Constanta Municipality
General objective Increase of the educational infrastructure relevant for the labour market in Constanța Municipality, as determining factor for the increase of the educational process quality, early development of children, for building social skills and the social integration capacity.
Total value of the project 10.247.493,19  lei, out of which eligible value 10.236.783,19 lei
Value of eligible co-financing (2%)

204.880,87 lei

Suggested implementation period 28.07.2020 –  28.02.2023
14. INTEGRATED STRATEGIC PLANNING AND EFFICIENT PUBLIC ADMINISTRATION AT THE LEVEL OF GROWTH POLE “INTERCOMMUNITY DEVELOPMENT ASSOCIATION CONSTANȚA METROPOLITAN AREA”
Financing source Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020
MySMIS code/ project code MySMIS 2014: 135502/ SIPOCA 849
Beneficiary Administrative Territorial Unit Constanta Municipality
Partner Intercommunity Development Association „Constanța Metropolitan Area”
Total value of the project Total eligible value of the project – 3.699.711,30 lei;
Beneficiary’s eligible co-financing – 53.674,95 lei (2%);
Partner’s eligible co-financing – 20.319,28 lei (2%);
Valoare eligibilă nerambursabilă din FSE – 3.127.483,22 lei;
Valoare eligibilă nerambursabilă din bugetul național – 498.233,85 lei.
Implementation period 20.07.2020 – 19.01.2023
Objectives The general objective of the project is to improve the administrative capacity at the level of Administrative Territorial Unit Constanţa Municipality and its entire Functional Urban Area, by developing the capacity of integrated strategic planning, streamlining the management processes and simplifying administrative procedures, in order to respond, in a fundamental and coherent way, to local communities needs.
Specific objectives
Specific objective 1 –  Development of strategic planning capacity at the level of Administrative Territorial Unit Constanţa Municipality and Constanţa Metropolitan Area, by updating the Integrated Urban Development Strategy and the portfolio of priority projects of Constanța Metropolitan Area;
Specific objective 2 – Streamlining and simplifying of services provided to citizens by Administrative Territorial Unit Constanţa Municipality through a ”shared skills” computer system and further retro-digitization archive;
Specific objective 3 –  Strengthening the institutional capacity of Administrative Territorial Unit Constanţa Municipality and other local public authorities in the Constanţa Metropolitan Area, by adequately training staff in the field of strategic planning and efficient public management.
Results – Updated Integrated Urban Development Strategy and portfolio of priority projects of the Constanța Metropolitan Area;
– Achieved ”shared skills” computer system;
– Electronic archive made for at least 900 linear meters physical archive;
– 44 trained persons at Constanța Metropolitan Area level.
15.  IMPROVEMENT OF MOBILITY IN CONSTANŢA MUNICIPALITY, 1 MAI BLVD. –  ȘOSEAUA MANGALIEI ROAD AREA
Financing source Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e
Beneficiary Administrative Territorial Unit Constanţa Municipality
Grant contract 5568/11.06.2020
General objective The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 Mai Blvd. and Șoseaua Mangaliei Road. In order to encourage the use of more environment-friendly transport means, some lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility by making investments in the urban public transport infrastructure and in the infrastructure specific for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All these shall lead to the improvement of the environmental conditions and life quality for the citizens and visitors of Constanța Municipality.
Total value of the project 69.800.962,02 lei

 

Value of eligible co-financing (2%) 1.396.019,24  lei
Proposed implementation period 11.06.2020 – 31.07.2023
16. REHABILITATION, MODERNIZATION AND EQUIPMENT OF TECHNOLOGICAL HIGH SCHOOL DIMITRIE LEONIDA BUILDING, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 4/ Investment priority 4.5
Beneficiary Administrative Territorial Unit Constanta Municipality
Financing contract 5352/30.04.2020
General objective Rehabilitation, modernization and equipment of C3 Corps of Technological High School Dimitrie Leonida (the canteen restord in workshops), in order to ensure the operation of secondary technological education activities in optimal conditions, at standards comparable to those in the European..
Total value of the project 7.777.842,86 lei
Value of the eligibile cofinancing (2%) 153.103,27 lei
Suggested implementation period  01.05.2020 – 31.12.2022
17. INCREASE OF ENERGY EFFICIENCY OF THE CONSTANȚA STATE THEATRE BUILDING
Financing source Regional Operational Programme 2014-2020 – Axis 3/ Investment priority 3.1.B -SUERD/1
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 5336/30.04.2020
General objective The general objective of this project is the increase of the energy efficiency of the building where the State Theater operates, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
Total value of the project 4.863.953,22 lei
Value of the eligibile cofinancing (2%) 63.089,04 lei
Suggested implementation period  01.05.2020 – 30.11.2023
18. PEDESTRIAN ACCESS AND MOBILITY IN THE CENTRAL AREA OF CONSTANŢA MUNICIPALITY
Financing source Regional Operational Programme 2014-2020 Priority axis 4, Investment priority 4e
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 5224/06.04.2020
General objective The general objective of the project is the promotion of sustainable urbane mobility by the urban regeneration of the central area by a series of measures which lead to the increase of pedestrian accessibility and mobility in this area of the municipality. The aim of this project is to increase the modal share of moving by food and by bicycle, by transforming the segment of Ștefan cel Mare street in a modern pedestrian esplanade (sidewalks and shared-space areas), by rehabilitating the adjacent streets and by creating lanes dedicated to public transport and bicycle paths on Ferdinand Blvd. and Mircea cel Bătrân street. Moreover, the intention is to make the use of motor vehicles in the central area of the municipality less attractive. For this purpose, the access of personal/private motor vehicles in this area will be limited, which shall lead to the reduction of CO2 equivalent emissions.
Total value of the project 89.854.757,70 lei from which eligible value 89.854.757,70 lei
Value of the eligibile cofinancing (2%) 1.797.095,20 lei
Suggested implementation period 06.04.2020 – 30.06.2023
19. INCREASE OF ENERGY EFFICIENCY OF THE 8 SECONDARY SCHOOL BUILDING, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 3/ Investment priority 3.1.B -SUERD/1
Beneficiary Administrative Territorial Unit Constanta Municipality
Financing contract 5172/24.03.2020
General objective Increase of the energy efficiency for the building where the 8 Secondary School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.
Total value of the project 4.878.047,09 lei, from which eligible value 4.537.724,78 lei
Value of the eligibile cofinancing (2%) 90.754,52 lei
Suggested implementation period 24.03.2020 – 30.09.2023
20. INCREASE OF ENERGY EFFICIENCY OF THE 38 SECONDARY SCHOOL BUILDING, DIMITRIE CANTEMIR, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 3/ Investment priority 3.1.B -SUERD/1
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 5095/25.02.2020
General objective Increase of the energy efficiency for the building where the 38 Secondary School, Dimitrie Cantemir of Constanța Municipality operates, by implementation of a set of measures to optimize the energy consumption of the building and to align to the European performance standards and requirements.
Total value of the project 5.406.111,64 lei, from which eligible value 4.735.030,83 lei
Value of the eligibile cofinancing (2%) 94.700,62 lei
Suggested implementation period 25.02.2020 – 30.09.2022
21.  MOBILITY IMPROVEMENT IN CONSTANŢA MUNICIPALITY, BETWEEN TRAIN STATION AND MAMAIA RESORT
Financing source Regional Operational Programme 2014-2020, Priority axis 4, Investments priority 4e
Beneficiary Administrative Territorial Unit Constanţa Municipality
Grant contract 5091/17.02.2020
General objective The general objective of the project is to improve the urban mobility in Constanța Municipality, by a re-systematization of the transport infrastructure on 1 decembrie 1918 Blvd. and Alexandru Lăpușneanu Blvd.  In order to encourage the use of more environment-friendly means of transport, lanes dedicated to public transport and to bicycles will be introduced and the roadway and sidewalks will be rehabilitated. The purpose of these interventions is mainly to reduce the GHG emissions and to promote sustainable urban mobility through investments in the urban public transport infrastructure and in the specific infrastructure for travelling by foot and by bicycle, in order to ensure a free and safe movement of people. All of these will lead to the improvement of environmental conditions and life quality for the citizens and visitors of Constanța Municipality.
Total value of the project 91.361.641,40 lei

 

Value of eligible co-financing (2%) 1.827.232,84  lei
Proposed implementation period 17.02.2020 – 30.04.2023
22. REHABILITATION, MODERNISATION AND ENDOWMENT OF “AMICII” FULL-DAY KINDERGARTEN, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4.4 Investments in education, in training, including professional training for the aquirement of skills and learning during lifetime, through the development of education and training infrastructures
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing order 5029/20.12.2019
General objective By rehabilitating, modernising and equipping “AMICII” full-day kindergarten of Constanța Municipality, the aim is to ensure that the educational activities intended for pre-school education are carried out in optimum conditions, at standards comparable with those of the European Union
Total value of the project 6.057.289,73 lei
Value of eligible co-financing (2%) 120.931,60 lei
Suggested implementation period  30.08.2018 – 30.06.2022
23. ACQUISITION OF PUBLIC TRANSPORTATION BUSES – ELECTRICAL BUSES 10 METERS LENGTH, ALEXANDRIA, BRĂILA, CONSTANȚA, DROBETA TURNU SEVERIN, FOCȘANI, SLOBOZIA
Financing source Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4e
Leader Ministry of Public Works, Development and Administration
Partners Admnistrative Territorial Unit Alexandria Municipality,  Admnistrative Territorial Unit Brăila Municipality, Admnistrative Territorial Unit ConstanȚa Municipality, Admnistrative Territorial Unit Drobeta Turnu Severin Municipality, Admnistrative Territorial Unit FocȘani Municipality, U.A.T. Admnistrative Territorial Unit Slobozia Municipality
 Financing order  4817/04.11.2019
General objective Acquisition of 21 electric buses of 10 meters length, 21 slow loading stations and 5 fast loading stations
Total value of the project for the Admnistrative Territorial Unit Constanta Municipality partner 56.388.223,95 lei

 

Value of eligible co-financing (2%) 968.164,48 lei
Proposed implementation period 04.11.2019 -31.12.2022
24. ACQUISITION OF PUBLIC TRANSPORTATION BUSES – ELECTRICAL BUSES 12 METERS LENGTH, ALBA IULIA, BUZĂU, CONSTANTA, PLOIESTI
Financing source Regional Operational Programme 2014-2020 in partnership, Priority axis 4, Investment priority 4e
Leader Ministry of Regional Development and Public Administration
Partners Admnistrative Territorial Unit Constanta Municipality, Admnistrative Territorial Unit  Alba Iulia Municipality, Admnistrative Territorial Unit Buzău Municipality, Admnistrative Territorial Unit Ploiești Municipality

General objective Acquisition of 20 electric buses with 12 meters length, 20 slow loading stations and 5 fast loading stations
The total value of the project for the partner U.A.T. Constanța 65.733.918,25  lei

Eligible co-financing amount (2%) 1.124.678,37  lei
Suggested implementation period 01.10.2019 – 28.02.2023
25. BUSINESS INCUBATOR CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 2.1B
Beneficiary Administrative Territorial Unit Constanța Municipality
Financing contract 4485/01.07.2019
General objective Consists in creating a sectoral business incubator, intended for the sector of creative industries, in a building having the height capacity S+P+4E+M [*basement + ground floor + 4 floors + attic], located in Constanța Municipality, aiming to become the first regional hub for the entrepreneurial community involved in the sector of creative industries in the South – East region and to contribute to the growth of the regional competitiveness, to the generation of innovation and new skilled employment with competitive pay. The incubator shall provide high quality support services for the incubated companies and shall create mechanisms facilitating the transfer of experience, know-how and knowledge specific to successful business development, both by the new entrepreneurs of the creative industries, as well as by the entire entrepreneurial community in the South – East region.
Total value of the project 14.028.656,56 lei, non-refundable amount 7.048.091,68 lei
Value of eligible co-financing 46,89%

6.222.491,68 lei

Suggested implementation period 01.07.2019 – 31.03.2023
26. REHABILITATION OF 16 SECONDARY SCHOOL „MARIN IONESCU DOBROGIANU”
Financing source Regional Operational Programme 2014-2020 – Axis 10
Beneficiary Administrative Territorial Unit Constanța Municipality
Financing contract 4333/23.05.2019
General objective The general objective of the project is to improve the quality of the educational infrastructure, namely the rehabilitation, modernisation, extension and endowment of 16 Secondary School “Marin Ionescu Dobrogianu” of Constanța in order to ensure an educational process at European standards, an increase of the participation of school population and adults to the educational process.
Total value pf the project 6.342.072,04 lei,  non-refundable amount 6.327.181,12 lei
Value of eligible co-financing (2%) 126.543,67 lei
Suggested implementation period 23.05.2019 – 31.08.2022
27. SMART CT
Financing Source Project co-financed by the din European Social Fund, through the Operational Programme Administrative Capacity 2014-2020
MYSMIS code/ project code MySMIS 2014: 126409/ SIPOCA 551
Beneficiary Administrative Territorial Unit Constanța Municipality
Total value of the project Total eligible value of the project – 3,618,486.48 lei;
Eligible co-financing of the beneficiary – 72,369.73 lei (2%);
Non-refundable eligible amount from ESF – 3,075,713.52 lei;
Non-refundable eligible amount from national budget- 470,403.23 lei;
Implementation period 05.12.2018 – 04.01.2023
Objectives The general objective consists in strengthening the administrative capacity of the Administrative Territorial Unit Constanța Municipality by developing the strategic planning capacity and by simplifying the administrative procedures, in correlation with the introduction of electronic methods for the management of administrative documents.

Specific objectives
Specific objective 1 –  Development of the strategic planning capacity at the level of the local public administration of Constanţa Municipality by crating the Smart City Strategy for the municipality;
Specific objective 2 – Increasing the efficiency and simplifying the services provided for citizens by implementing a portal of digital services for citizens, documents management, ERP and partial digitalization of the archive;
Specific objective 3 –  Promoting modernisation I nteh local public administration of Constanţa Municipality by specialising the city hall employees on topics specific to the project (strategic planning), which shall motivate and drive them towards innovation and providing quality public services for citizens.

Results – the Smart City Strategy of the a municipality is elaborated
– the analysis – diagnostic of the computer and document management system;
– developed and implemented integrated computer system;
– electronic archive for at least 1600 linear meters of physical archive;
– 10 persons trained in the field of strategic planning.
IV. FINISHED PROJECTS

1. INCREASE OF ENERGY EFFICIENCY OF THE 17 SECONDARY SCHOOL BUILDING, ION MINULESCU, CONSTANȚA
Financing source Regional Operational Programme 2014-2020 – Axis 3/ Investment priority 3.1.B -SUERD/1
Beneficiary Administrative Territorial Unit Constanta Municipality
Financin contract 5141/12.03.2020
General objective Implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.
Total value of the project 4.208.917,27 lei, from which eligible value 3.838.412,59 lei
Completion date 30.09.2020
2. Communication Of Local AuthoRities For INtegration In European Towns (ACRONYM CLARINET)
Financing source EUROPEAN COMMISSION-AMIF-2017-AG-INTE
Leader Comuni Di Lampedusa E Linosa, Italy
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia,  Cyprus, Bulgaria, Belgium.

Total value of the project 786.869,22 euro
General objective Increase the awareness of EU citizens about the positive contribution that migrants bring to EU host societies.
Completion date 30.06.2022
1. MULTI-MODAL OPTIMISATION FOR ROAD-SPACE IN EUROPE (ACRONYM MORE)
Financing Source HORIZON 2020 – MG-7-2-2017 ;
Leader UNIVERSITY COLLEGE OF LONDON , United kingdom;
Partners Administrative Territorial Unit Constanța Municipality  together with entities from Germany, France, Holland, United kingdom, Belgium, Czech Republic, Hungary, Romania, Portugal, Sweden;
Total value of the project 5.537.113.75 euro
Partner value
Administrative Territorial Unit Constanța Municipality
– Total eligible value:  194,375 euro;
– Integral financing from the European Commission;
Implementation period 01.09.2018 – 28.02.2022
Objectives Ensuring a comprehensive and objective approach for planning, designing and operating the road territory on the corridors of the international roads network TEN-T;
Results 5 Strategies for a better allocation of the road territory for the roads making the connection with the TEN-T European network.
2. INCREASE OF ENERGY EFFICIENCY OF THE OVIDIUS THEORETICAL HIGH SCHOOL BUILDING, CONSTANTA
Financing Source Regional Operational Programme 2014-2020 – Axis 3/ Investment priority 3.1.B
Beneficiary Administrative Territorial Unit Constanţa Municipality
Financing contract 2897/16.08.2018
General objective Increase of the energy efficiency for the building where the Ovidius Theoretical High School of Constanța operates, by implementing a set of measures designed to optimize the energy consumption of the building and alignment to the European performance standards and requirements.
Total value of the project 10,350,870.72 lei
Value of eligible co-financing (2%) 205,650.53 lei
Suggested implementation period 16.08.2018-20.01.2022
3. SNAPSHOTS FROM THE BORDERS – SMALL TOWNS FACING THE GLOBAL CHALLENGES OF AGENDA 2030
Financing Source DEAR (Development Education and Awareness Raising)
Leader Comuni Di Lampedusa E Linosa, Italy
Partener Administrative Territorial Unit Constanța Municipality, together with entities from Romania, Italy, Austria, Hungary, Greece, Germany, Slovenia, Bosnia – Herzegovina, Cyprus, Bulgaria, France, Sweden, Spain, Malta
Total value of the project 5.352.358,28 euro
Value of the partener Administrative Territorial Unit Constanța Municipality 46.123,01 euro, out of which:
– non-refundable eligible value: 41.335,44 euro;
– eligible co-financing: 4.787,57 euro (10,38%).
General objective Improvement of critical understanding of the European, national and local decision-makers, as well as of the public opinion regarding the migration determined by the European border flows.
Results – Increased number of European citizens informed on global migration and on key factors which determine migration and a high understanding from the local decision-makers regarding the key factors determining the migration flows;
– The „Border cities network” shall be built as an innovative tool in order to develop itself horizontally.
Completion date 20.10.2021
4. ALTERNATIVE BUILDING ACTIVATION UNITS (ACRONYM ALT/BAU)
Financing Source URBACT III Program – Transfer Networks Phase II
Leader City of Chemnitz, Germany
Partners Administrative Territorial Unit Constanța Municipality, together with entities from Poland, Latvia, Belgium, Spain, Italy;
Total value of the project 595.000 euro /network (stage I + stage II)
Value of the partner Administrative Territorial Unit Constanța Municipality 44.715 euro, out of which
– ERDF contribution 38.007,75 euro (85%);
– local co-funding 894,30 euro (2%);
General objective Revitalisation of vacant and degraded historical buildings, by a proactive approach of connection to the public administrations, owners, investors and users.
Results Experience and good practices exchange at transnational level.
Completition date 30.09.2021
5. DEVELOPMENT OF SUSTAINABLE CULTURAL TOURISM IN THE BLACK SEA BASIN (ACRONYM CULTOUR-BSB)
Financing Source Joint Operational Programme „Black Sea Basin” 2014-2020
Leader Sozopol Municipality, Bulgaria
Partners Administrative Territorial Unit Constanța Municipality  together with entities from Georgia, Ukraine, Turkey
Total value of the project 957,792.24 euro
Partner value
Administrative Territorial Unit Constanța Municipality
– Total eligible value:  118,169 euro;
– Non-refundable eligible amount from ENI: 108,715.48 euro (92 %);
– Eligible co-financing: 9,453.52 euro (8%);
General objective Joint development and promotion of cross-border business opportunities in the tourism sector within the Black Sea Basin, with an emphasis on the cultural segment.
Results A joint strategy for the promotion of cross-border tourism.
Completion date 10.09.2021
6. CERTOUR II: FOR A BETTER SME MANAGEMENT (ACRONYM CERTOUR II)
Financing Source Joint Operational Programme „Black Sea Basin” 2014-2020
Leader Technical Chamber of Greece – Eastern Macedonia Branch;
Partners Administrative Territorial Unit Constanța Municipality  together with entities from Ukraine, Turkey, Armenia, Greece;
Total value of the project 827,860 euro;
Partner value
Administrative Territorial Unit Constanța Municipality
– Total eligible value: 156,562 euro;
– Non-refundable eligible amount from ENI: 144,037.04 euro (92%);
– Eligible co-financing: 12,524.96 euro (8%);
Completion date 10.07.2021
Objectives Improvement of the management and persons working in the SMEs in the field of tourism;
Results Building an integrated platform for the management of SMEs with the support of mentors register, management tools and e-training platform.
7.  INTEGRATED MEASURES FOR A BETTER LIFE
Financing Source POCU 2014-2020 (Operational Programme Human Capital) – Operation 4.1
Leader Administrative Territorial Unit Constanța Municipality
Partener „Decebal” Theoretical High School
Total value of the project 10,854,192.75 lei out of which refundable amount 10,788,092.75 lei
General objective Reducing the number of persons at risk of poverty or social exclusion from the studies marginalised community where there is Rroma population, by supporting the social and economic integration of 600 persons from the marginalised community residing in the intervention area which includes the „Henri Coandă” social campus as well.
Results –  Integrated social services, medical and medico-social services
–  Supporting access and participation to education;
–  Support or access and/or maintaining on the labour market;
–  Supporting entrepreneurship and employment on one’s own;
–  Improvement of living conditions.
Completion date 15.08.2021
8. PORT – CITIES: INNOVATION FOR SUSTAINABILITY (ACRONYM PORTIS)
Financing Source Horizon 2020 –  MG.5.5 – 2015;
Beneficiary City of Anvers, Belgium;
Partener Administrative Territorial Unit Constanța Municipality, together with 33 entities from 33 the Consortium: Belgium, Scotland, Italy, Lithuania, China;
Total value of the project 17,678,400.00 euro
Partner value
Administrative Territorial Unit Constanța Municipality
476,078 euro
– Non-refundable eligible value: 476,078 euro;
completion date 30.11.2020
General objective Innovative solutions on the manner in which the mobility and accessibility measures are used to increase the functional and social cohesion between the city and the port.
Results Improvement of the governance for an increased cooperation between cities and ports, creating a more sustainable and healthier city-port environment, creating an integrated transport infrastructure and mobility system, increasing the efficiency of the urban passenger and freight transport.
completion date
completion date
completion da
9. „WIFI4 EU PROMOTION OF INTERNET CONNECTIVITY IN LOCAL COMMUNITIES” OF CONSTANȚA MUNICIPALITY
Financing Source Free Wi-Fi for Europeans Programme
Financing contract INEACEF/WiFi4EU/1/2018/010009-013149
Leader Administrative Territorial Unit Constanța Municipality
Total value of the project 13.336 euro (voucher)
completion date 18.06.2020
General objective The initiative WiFi4EU promotes free access to Wi-Fi in public areas such as parks, squares and public buildings, libraries, health care centres and museums, in the entire EU.
Results Installation of new Wi-Fi networks in order to provide free access to Wi-Fi in10 locations on seafront of Constanța Casino.
10. INCREASING THE ADMINISTRATIVE CAPACITY OF CONSTANȚA MUNICIPALITY BY IMPLEMENTING MEASURES IN THE FIELD OF ANTICORRUPTION 
Financing Source ““Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”
MySMIS code/ project code MySMIS 116521/ SIPOCA 405
Beneficiary Administrative Territorial Unit Constanța Municipality;
Total value of the project Total eligible value of the project – 237.579,83 lei;
Eligible co-financing of the beneficiary – 4.751,60 lei;
Non-refundable eligible amount from ESF – 201.942,85 lei;
Non-refundable eligible amount from national budget – 30.885,38 lei.
completion date 23.11.2019

Objectives

General objective
Elaborating an anticorruption operational procedure, of a guide/manual of good practices of ethics and integrity and training the staff of the Constanţa City Hall in order to enforce the corruption prevention measures.

Specific objectives
Specific objective 1 –  Elaborating a guide/ operational procedure on corruption and the necessary measures to prevent it;
Specific objective 2 – Elaborating a campaign for the education of anticorruption behaviour;
Specific objective 3 –  Training the employees of the Constanţa City Hall in the field of anticorruption, ethics and integrity (40 persons).

Results

– Guide /manual of good practices, standards of ethics and integrity;
– Elaborated operational procedure;
– Anticorruption education campaigns;
– 40 persons from the Constanța City Hall certified at the end of the courses in the field of corruption prevention, transparency, ethics and integrity.
Procedura în vederea implementarii măsurilor anticorupție
Manual de bune practici, standarde de etică și integritate
Pliant angajați
Pliant cetățeni
11. INCREASING THE ADMINISTRATIVE CAPACITY OF CONSTANȚA MUNICIPALITY BY IMPLEMENTING AND MAINTAINING THE QUALITY MANAGEMENT SYSTEM ISO 9001 
Financing Source “Project co-financed by the European Social Fund, through the Operational Programme Administrative Capacity 2014-2020”
MySMIS code/ project code MySMIS 109686/SIPOCA 122
Beneficiary Administrative Territorial Unit Constanța Municipality
Total value of the project TTotal eligible value of the project – 422,917.67 lei;
Eligible co-financing of the beneficiary – 8,458.35 lei;
Non-refundable eligible amount from ESF – 359,480.02 lei;
Non-refundable eligible amount from national budget – 54,979.30 lei;
completion date 24.10.2019

Objectives

General objective – Implementation and certification of the quality management system in accordance with the provisions of the standard SR EN ISO:2015.
Specific objectives
Specific objective 1 – Reviewing and optimisation of the internal work flows;
Specific objective 2 – Implementing the  quality management system in accordance with the provisions of the standard SR EN ISO 9001:2015;
Specific objective 3 – Promoting modernisation in the local public administration of Constanța Municipality, by specialising the City Hall employees on topics specific to quality management (551 persons).
Results – Quality management system ISO 9001 implemented in the City Hall of Constanța Municipality;
– Staff of the local public administration of Constanța municipality trained on topics specific to quality management in public administration.
 certification   ISO 9001:2015
12. PARTNERSHIP – ACTION PLAN REGARDING AIR QUALITY
Financing source European Commission / Government of Netherlands
Partners Member states: Netherlands (coordinator), Croatia, Sweden;
Cities: London, Utrecht, Milan, Constanța;
European institutions: European Commission, Eurocities, Urbact, Joint Research Centre
Financing contract Volunteer participation
Project completion date 15.03.2019
Objective Identification of issues regarding the air quality and the impact on health, especially in the urban area. The partnership is part of the Urban Agenda of the European Union and implies an exchange of information and good practices between partner states.
 Results  Result 1: Establishing the information regarding the air quality and the influence on health – situations specific to each city;
Result 2: Identification of the financing sources and the regulations on air quality in order to establish the contradictions / lacks / specific examples in the legislation;
Result 3: Presenting examples of good practices in the field of air quality;
Result 4: Elaborating a Guide for cities that want to create an action plan regarding air quality. This Guide shall include the best examples of both legislation and implemented actions.(coordinator Constanṭa and Milan).
13. “IMPROVEMENT OF THE ACCESS BETWEEN CONSTANȚA MUNICIPALITY AND NĂVODARI INDUSTRIAL PLATFORM BY WIDENING AND MODERNISING THE MAMAIA-NĂVODARI BOULEVARD”
Financing source Regional Operational Programme 2007-2013 – Axis 1.1.
Beneficiaries Administrative Territorial Unit Năvodari
Administrative Territorial Unit Constanţa Municipality
Financing contract 3535/04.12.2012
Total value of the project 57,943,411.05 lei
Project completion date 01.11.2016
Objectives Improvement of the access between Constanța Municipality and Năvodari industrial platform by widening and modernising the Mamaia-Năvodari Boulevard, development and valorisation of the economic potential of the area, increase of the accessibility level of the city of Năvodari in order to valorise the touristic potential of the area and increasing its role in the development of Constanța County.
Results Rehabilitated and modernised urban streets – 6,3 km.
14. “SENIORS PARK -EXTENDING THE RETIREMENT HOME BY A NEW BUILDING”
Financing source Regional Operational Programme 2007-2013 – Axis 1.1.
Beneficiaries Administrative Territorial Unit Constanţa Municipality
Financing contract 3347/17.08.2012
Total value of the project 4,849,595.99  lei, out of which 3,716,384.73 lei non-refundable amount
Project completion date 01.11.2016
Objectives Rehabilitation works for the retirement home and its extension by a new building P+2E [*ground floor + 2 floors] having the functions of administrative areas, accommodation areas, medical practice areas, socialisation area, storage areas.
Results The accommodation capacity has been increased by 48 seats, out of which 28 seats in the new building and 20 seats created as a result of the fact that the offices and medical practices were moved from the old accommodation building in the new building, in the rooms having this destination.
15. “REHABILITATION AND MODERNISATION OF PUBLIC LIGHTING IN SOME LOCALITIES OF THE CONSTANŢA METROPOLITAN AREA.”
Financing source Regional Operational Programme 2007-2013 – Axis 1.1.
Beneficiaries Administrative Territorial Unit Constanţa Municipality
Financing contract 5052/27.02.2015
Total value of the project 32,296,166.58 lei, out of which 31,461,099.79 lei non-refundable amount
Project completion date 31.10.2016
16. BLACK SEA BIKE – DIVERSIFICATION OF THE TOURISM SERVICES IN CONSTANTA – BALCHIK CROSS BORDER REGION BY BIKE – BSB
Financing source Operational Programme for Cross-border Cooperation Romania-Bulgaria 2007-2013;
Beneficiary Administrative Territorial Unit Constanța Municipality;
Partner Balchik Municipality, Bulgaria
Financing contract 34544/26.04.2013
Total eligible value of the project 1,498,533.24 euro
Value from the Administrative Territorial Unit Constanța Municipality 1,180,618.24 euro, out of which:
– own co-financing: 25,737.48 euro (2,18%)
Completion date 15.09.2016
Objective Diversification of the touristic services by creating a network of bicycle stations in the cities of Constanța and Balchik.
Results – 24 bicycle stations Constanța Municipality, 6 bicycle stations in Balchik.
– 390 bicycles purchased for Constanța Municipality and 100 bicycles purchased for Balchik Municipality, which shall be provided for the users free of charge.
17. BUILDING A MULTILEVEL PARKING P+7E+T [*GROUND FLOOR + 7 FLOORS + TERRACE]‚ IN MAMAIA RESORT, CASINO-ALBATROS AREA”
Financing source Regional Operational Programme 2007-2013 – Axis 1.1..
Beneficiaries Administrative Territorial Unit Constanţa Municipality
Financing contract 3767/18.07.2013
Total value of the project 14,281,544.79 lei, out of which  13,995,913.89  lei non-refundable amount
Project completion date 30.06.2016
Objectives Development of the urban public infrastructure in order to modernise the public services in general and the touristic services in special, by building a multilevel parking P+7E+T in Mamaia Resort, Casino-Albatros area.
Results 394 new parking spaces
18. INTEGRATED MEASURES FOR EQUALITY OF CHANCES
Financing source Sectoral Operational Programme Human Resources Development 2007-2013 – Axis 6 “Promoting social inclusion”
Beneficiary Administrative Territorial Unit Constanța Municipality
Partners “Ovidius” University of Constanța and the Institute for Human Resources Development
Financing contract Sectoral Operational Programme Human Resources Development no. 146/6.3/G/130592/29.04.2014
Contract value 1,990,385 lei
Project completion date 15.12.2015
Objective Facilitating access on the labour market for vulnerable groups (women) and building a professional career in the context of promoting an inclusive society for the welfare of women in the urban and rural environment of the South – East region.
Results 588 women trained/qualified through the following courses: human resources inspector, trade worker, baby-sitter, English language and social and civic skills.
web-site: www.egalitate-de-sanse.ro
19. MAMAIA TOURIST PROMENADE
Financing source Regional Operational Programme 2007-2013–Axis 1.1.
Beneficiary Administrative Territorial Unit Constanța Municipality
Financing contract 3348/17.08.2012
Contract value 68,685,880.49 lei, out of which 48,317,628.50 lei non-refundable amount
Project completion date 17.08.2015
Results Modernisation and restoration of the tourist promenade of Constanţa Municipality – Vacation Village area and Mamaia Resort:
Rehabilitation of the main pedestrian alley of the Vacation Village;
Rehabilitation and restoration of Perla plaza;
Rehabilitation and restoration of Malibu – Perla – Mamaia Casino promenade;
Rehabilitation and modernisation of Mamaia Casino promenade and plaza;
Rehabilitation and restoration of Club Castel Casino promenade – up to the vicinity of Vega hotel;
1,090 new parking spaces and 126,102 m2 of restored and furnished promenade (benches, garbage cans, lighting poles etc.).
20. INTEGRATED RESTORATION OF THE PEDESTRIAN AREA IN THE HISTORICAL CENTRE OF CONSTANŢA MUNICIPALITY
Financing source Regional Operational Programme 2007-2013–Axis 1.1.
Beneficiary Administrative Territorial Unit Constanța Municipality
Financing contract 3034/10.05.2012
Contract value 37,934,638.30 lei out of which 29,807,506.65 lei non-refundable amount
Project completion date 10.06.2015
Results Rehabilitation of the urban infrastructure in the historical centre of Constanţa Municipality by: Rehabilitating a number of 21 streets in the Peninsular area of Constanţa Municipality; Creating/ rehabilitating the rain water sewerage system associated with the rehabilitated streets; Providing urban furniture for the area: lighting poles, road signs, garbage cans, ashtrays.
21. “RESTORATION AND REARRANGEMENT OF THE PROMENADE AND GREEN AREAS IN THE VRAJA MĂRII – CASINO – TOMIS PORT AREA”
Financing source Regional Operational Programme 2007-2013–Axis 1.1.
Beneficiary Administrative Territorial Unit Constanța Municipality
Financing contract 3030/10.05.2012
Total value of the project 12,370,510.26 lei, out of which 12,123,100.06  lei non-refundable amount
Project completion date 10.11.2014
Results Rehabilitation of the urban public infrastructure in the historical area of Constanţa Municipality by: Repairs and restoration of support walls, guard rail; Arrangement of promenade alley; Modernisation of pedestrian alleys in the park and arrangement of green areas; Urban furniture (kiosks, gazebos, benches, fountains and drinking fountains, lighting poles).
22. IMPROVE ACCESS TO THE MAMAIA RESORT BY BUILDING PEDESTRIAN WALKWAYS
Financing source Regional Operational Programme 2007-2013–Axis 1.1.
Beneficiary Administrative Territorial Unit Constanța Municipality
Financing contract 3256/23.07.2012
Contract value 11,067,838.24 lei, out of which 8,392.273.32 lei non-refundable mount
Project completion date 23.06.2014
Results Three pedestrian catwalks located in the areas: Vacation Village, Casino and Rex.
23. “RESTORATION AND INTEGRATED RE-ARRANGEMENT OF THE HISTORICAL AREA – OVIDIU SQUARE”
Financing source Regional Operational Programme 2007-2013 – Axis 1.1.
Beneficiaries Administrative Territorial Unit Constanţa Municipality
Financing contract 3031/10.05.2012
Total value of the project 10,581,294.13 lei, out of which 8,494,477.56 lei non-refundable amount
Project completion date 10.05.2014
Results Rehabilitation of the degraded urban public infrastructure of the Historical Centre of Constanța Municipality by rehabilitating the following objectives: Ovidiu Square; Streets: Vasile Canarache, Marcus Aurelius and Aleea Vasile Canarache;
Access stairs:
a) from Marcus Aurelius Street to Tomis Port;
b) Vasile Canarache Steet to Termele Romane Street;
Urban furniture: benches, lighting poles, garbage cans, ashtrays.
Rain water sewerage; Public lighting system; Green areas – embankments.
25. CONSTANȚA, FIRST STEP OF YOUR LONG JOURNEY – PROMOTING THE CONSTANȚA MAMAIA TOURISTIC AREA
Financing source Regional Operational Programme 2007-2013 – Axis 5.3.
Beneficiaries Administrative Territorial Unit Constanţa Municipality
Partners Black Sea / Danube Delta Tourism Promotion Association
Financing contract 1375/05.04.2011
Contract value 1,036,640 lei
Project completion date 04.04.2013
Objective Valorisation of the cultural, historical and natural heritage of the Constanța – Mamaia touristic area, extending the general perception of “vacation in the sun at the seaside” to “knowledge vacation”, on three touristic topics:
Knowledge tourism;
Historical, architectural and religious cultural tourism;
Recreational, nature and biodiversity tourism.
Results 1,640.000 flyers;
4,000 brochures;
Creating the web-site: www.constanta-turistica.ro
25. “GREEN PARKING – BUILDING A MULTILEVEL PARKING IN THE CONSTANȚA COUNTY EMERGENCY CLINICAL HOSPITAL AREA, CONSTANȚA COUNTY”
Financing source Regional Operational Program 2007-2013- Axis1.1.
Beneficiaries Constanta Municipality
Financing contract 1517/20.04.2011
Total value of the project 12,186,543.36 lei, out of which 11,942,812.49 lei non-refundable amount
Project completion date 20.09.2012
Results 265 parking spaces were created
26. “REHABILITATION OF THE RETIREMENT HOME – UTILITIES AND CANTEEN BUILDING”
Financing source Regional Operational Programme 2007-2013 – Axis 3.2.
Beneficiary Administrative Territorial Unit Constanţa Municipality
Partner Retirement home in Constanța
Financing contract 611/29.01.2010
Total value of the project 3,189,125.29 lei, out of which 1,725,465.91 lei non-refundable amount
Project completion date 20.04.2011
Results Installation replacement (telephone, fire signalling , intercom);
Trim restoration;
Heating installation replacement;
Electrical, sanitary, ventilation installation replacement in the canteen and laundry room;
Equipment with food preparation facilities;
Equipment with laundry room facilities.
27. EUROPEAN ADMINISTRATION
Financing source PODCA 2007-2013 – Axis 1
Beneficiary Constanta Municipality
Partners Intercommunity Development Association „Constanta Metropolitan Area”
Financing contract 384780/17.03.2009
Contract value 248.746,20 lei, nonrefundable: 228.320,4 lei
Completion date 17.03.2010
Results 150 trained civil servants, who operate in the 14 municipalities of the cities that make up the metropolitan area of Constanta, in the fields of project management, public procurement, human resources, social and civic competences and internal audit.
28. REGIO-LLL
Financing source Leonardo da Vinci Programe- Networks section
Beneficiary FREREF – Fondation des Regions Europeennes pour la Recherche en Education et en Formation
Partners Constanta Municipality; Andaluza Fondo de Formacion y Empleo Foundation – Sevilla (Spain); Generalitat de Catalunya – Departament D’EDUCACIÓ – Barcelona (Spain); Servei d’ocupació de Catalunya. Department de Treball – Barcelona (Spain); Confédération Française des Travailleurs Chrétiens – CFTC Rhône – Alpes – Lyon (France); Chambre des Métiers et de l’Artisanat du Rhône – CMA 69 – Lyon (France); Centre National de la Recherche Scientifique – CNRS – Paris (France); Conseil Régional de Lorraine – Metz ( France); Conseil Régional de Rhône – Alpes – CHARBONNIERES LES BAINS (France); Université de Bretagne Sud – Lorient (France); Agenzia Regionale Istruzione Formazione Lavoro – Regione Lombardia – Milan (Italy); Centro Interateneo per l’Innovazione, la ricerca didattica e la formazione avanzata – Venice (Italy); Ministère de l’Education et de la Formation professionnelle du Grand-duché de Luxembourg/Service de la Formation professionnelle – Luxemburg; Województwo Małopolskie- Cracow (Poland); Conférence Intercantonale de l’Instruction Publique de la Suisse romande et du Tessin –Neuchatel.
Financing contract 2007-1985/001-001
Contract value 623.568 euro, nonrefundable
Completion date 2010
Results Papers, essays and case studies on promoting the transfer of best practices across interregional levels and policy implementation „Lifelong Learning”, according to the Lisbon Strategy.
29. “REHABILITATION OF THE RETIREMENT HOME IN CONSTANȚA”
Financing source Regional Operational Programme 2007-2013 – Axis 3.2.
Beneficiary Administrative Territorial Unit Constanţa Municipality
Partner Retirement home in Constanța
Financing contract 33/20.02.2009
Total value of the project 2,885.820.69 lei, out of which  2.823,635.81 lei non-refundable amount
Project completion date 20 February 2010
Results Restoration of bathrooms; restoration of the existing electrical installations;
Rehabilitation of elevators;
Restoration of the existing terrace by replacing the cover;
New building for water pumping system;
30. SUSTAINABLE OPERATIONAL PARTENERSHIP (POD) CONSTANȚA-DOBRICH
Financing source Program CBC RO-BG 2006 – Priority  4 “People to people”
Beneficiary Constanta Municipality
Partner Dobrich Municipality
Financing contract RO2006/018-405.01.04.19
Contract value 43.519 euro,  nonrefundable: 35.359 euro
Completion date 2009
Results 25 civil servants from Constanta Metropolitan Area and Dobrich District were trained in the fields of project cycle management; rules and procedures on the Structural Funds and the peculiarities of cross-border cooperation;
A portfolio of projects that can be implemented within the Operational Programme CBC Romania – Bulgaria 2007-2013;
A permanent working group composed of civil servants participating at the training.
31. URBAMECO
First stage
Financing source URBACT I 2002-2006 Programme
Beneficiary Grand Lyon (France)
Partners Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT
Contract value 98.100 euro,  nonrefundable
Completion date 2008
Results Local Action Plans, case studies, best practice recommendations
Second stage
Financing source URBACT II 2007-2013 Programme
Beneficiary Grand Lyon (France)
Partners Constanța Municipality; Goteborg Municipality, Sweden; Birmingham Municipality, Great Britain; Belfast Municipality , Ireland; Arnhem Municipality, Holland; Lodz Municipality, Poland; Pila Municipality, Poland; Wroclaw Municipality, Poland; Nea Ionia Magnesias Municipality, Greece.
REF 1750/FT
Contract value 594.975 euro, nonrefundable: 542.500 euro
Timeframe project 2008-2009
Completion date 2009
Results Local Action Plans, case studies, best practice recommendations
32. PHARE CBC „ECO”
Financing source PHARE CBC 2005 Programe – People to People
Beneficiary Constanta County School Inspectorate
Partners Constanța Municipality; Dobrich Municipality
Associations S.C. Gremlin Computers S.R.L.; EcoRomAmbalaje; MM Recycling; Eco Dobrogea; Eco ZOO Dobrich
Contract value 54.870 euro, nonrefundable
Completion date 2008
Results Environmental awareness among students;
Selective collection of packaging waste by the schools from Constanta and Dobrich, ecological summer camp.
33. BLACK SEA TOURISM
Financing source PHARE CBC 2005 Program – People to People
Beneficiary Travel agencies in Romania; citizens of the region Dobrich and Constanta County; tourists
Partners Constanța Municipality; Dobrich Municipality
Financing contract RO2005/017-535.01.03.09
Contract value 53.256 euro,  nonrefundable: 47.930,4 euro
Completion date 2008
Results A study on the current situation of the seaside tourism in Romania and Bulgaria;
Setting up an association for the development and promotion of tourism at the Black Sea, in order to strengthen relations of cooperation in tourism between the regions of Dobrich and Constanta (Bulgaria);
It was awarded by the European Commission in the final conference Concertour draft – Accessibility, Strategies, Solutions and Services for improving the European Sustainable Tourism, held in Rome on 25.09.2009.
34.  IMAPS
Financing source INTERREG III C PROGRAMME
Beneficiary Brest Urban Community, France
Partners Constanța Municipality; Technology Park Brest, France; Department of Fire and Emergency Situations, Brest, France; Matosinhos Municipality, Portugal; Institute of Water Northern Region, Matosinhos, Portugal; Taranto Municipality, Italy; Autoritatea Portuară, Taranto, Italia; Ovidius University, Constanța; Local Council Cadiz, Spain; Cadiz Univerity, Spain; Port authority Gijon, Spain; Local Council Isle of Wight, United Kingdom
Contract value 992.000 euro, nonrefundable: 979.500 euro
Completion date 2007
Results Creating a network of exchanges between the port cities facing similar problems.
35. E-PMC
Financing source PHARE 2002 – PROGRAMME
”The modernization fund for the development of local government and local budget”
Beneficiary Constanța Municipality
Financing contract RO2002/000-586.03.02
Contract value 40.000 euro, nonrefundable: 38.000 euro
Completion date 2005
Results Modernization of document management and operational management by implementing the electronic signature system.
36. CLEANER PRODUCTION AND ENERGY EFFICIENCY
Financing source Government of Norway
Beneficiary Economic operators from the city and county of Constanta
Partners Constanța Municipality; Norwegian Energy Efficiency Group; The Norwegian Society of Chartered Technical and Scientific Professionals; Pollution Prevention Center in Bucharest
Contract value 100.000 euro nonrefundable
Completion date 2005
Results On-land training; training  for Romanian instructors; Manuals on quality management and environmental management
37. TAPESTRY
Financing source General Directorate for Energy and Transport of the European Commission (DGTREN)
Beneficiary Direct autonomous transport – Constanța Municipality
Partners Transport and Travel Research Ltd., United Kingdom; Transport Studies Group, University of Westminster, United Kingdom; Hampshire County Council, United Kingdom; Herdfordshire County Council, United Kingdom; Langzaam Verkeer, Belgium; TISPT Consultores Em Transportes Inovacao e Sistemas SA, Portugal; Aristotle University of Thessaloniki, Greece; Asstra-Associatione Transporti, Italy; Citta di Torino, Italy; Romanian Union of Public Transport, Romania; Constanța Municipality, Romania; Interactions Ltd, Irland; Communaute Urbaine de Nantes, France; T.E.Marknadskommunikation A.B., Sweden
Contract value 3000.000 euro, nonrefundable
Completion date 2002
Results Development and implementation of case studies in areas such as:
1. Intermodal transportation;
2. Repositioning of the public transport;
3. Health and Environment.